화력발전소 고온 증기배관 실시간 변위감시 시스템 개발

현중섭, 이영신

Development of On-line Displacement Monitoring System for High Temperature Steam Pipe of Fossil Power Plant

Jung Seob Hyun, Young Shin Lee
JKSPE 2005;22(6):83-89.
Published online: June 1, 2005
  • 6 Views
  • 0 Download
  • 0 Crossref
  • 0 Scopus
prev next

Most domestic fossil power plants have exceeded 100,000 hours of operation with the severe operating condition. Among the critical components of fossil power plant, high temperature steam pipe systems have had a many problems and damage from unstable displacement behavior because of frequent start up and shut down. In order to prevent the serious damage and failure of the critical pipe system in fossil power plants, 3-dimensional displacement measurement system was developed for the on-line monitoring. Displacement measurement system was developed with a use of a LVDT type sensor and two rotary encoder type sensors. This system was installed and operated on the real power plant successfully.

Download Citation

Download a citation file in RIS format that can be imported by all major citation management software, including EndNote, ProCite, RefWorks, and Reference Manager.

Format:

Include:

Development of On-line Displacement Monitoring System for High Temperature Steam Pipe of Fossil Power Plant
J. Korean Soc. Precis. Eng.. 2005;22(6):83-89.   Published online June 1, 2005
Download Citation

Download a citation file in RIS format that can be imported by all major citation management software, including EndNote, ProCite, RefWorks, and Reference Manager.

Format:
Include:
Development of On-line Displacement Monitoring System for High Temperature Steam Pipe of Fossil Power Plant
J. Korean Soc. Precis. Eng.. 2005;22(6):83-89.   Published online June 1, 2005
Close