Skip to main navigation Skip to main content
  • E-Submission

JKSPE : Journal of the Korean Society for Precision Engineering

OPEN ACCESS
ABOUT
BROWSE ARTICLES
EDITORIAL POLICIES
FOR CONTRIBUTORS
Article

분해도 및 작업시간 산정을 통한 균형잡힌 조립공정계획에 관한 연구

신철균

Line Balanced Assembly Sequence Generation Based on a Verification of Disassemblability and Work Time

Chul Kyun Shin
JKSPE 2007;24(7):39-48.
Published online: July 1, 2007
  • 5 Views
  • 0 Download
  • 0 Crossref
  • 0 Scopus
prev next

This paper presents a method of a line balanced assembly sequence generation based on the verification of a disassemblability and a work time. To derive the disassemblability for a part to be disassembled, first we inference collision free assembly directions by extracting separable directions for the part. And we determine the disassemblability defined by the separability and stability cost. The separability cost represents a facility of the part disassembly operation, and the stability cost which represents a degree of the stability for the base assembly motion. Based upon the results, we propose a new approach of evaluating work time using neural networks. The proposed assembly sequence generation provides an effective means of solving the line balancing problem and gives a design guidance of planning assembly lay-out in flexible manufacturing application. Example study is given to illustrate the concepts and procedure of the proposed schemes.

Download Citation

Download a citation file in RIS format that can be imported by all major citation management software, including EndNote, ProCite, RefWorks, and Reference Manager.

Format:

Include:

Line Balanced Assembly Sequence Generation Based on a Verification of Disassemblability and Work Time
J. Korean Soc. Precis. Eng.. 2007;24(7):39-48.   Published online July 1, 2007
Download Citation

Download a citation file in RIS format that can be imported by all major citation management software, including EndNote, ProCite, RefWorks, and Reference Manager.

Format:
Include:
Line Balanced Assembly Sequence Generation Based on a Verification of Disassemblability and Work Time
J. Korean Soc. Precis. Eng.. 2007;24(7):39-48.   Published online July 1, 2007
Close